Search...
Overview

The project involved designing and detailing a residential compound comprising four 2-story buildings, with a total area of 1200 m² / 12920 ft².

The ORIGIN team’s task was to draft a model of LGS framing as part of the bill of materials for tender purposes.

 

Input: Architectural drawings set.

Project deliverables:

  • Draft structural drawings set;
  • Preliminary calculations;
  • Bill of material of LGS framing.
Services STRUCTURE
Subservices Light gauge steel design and detailing
Industry Residential
Object type Multi-family home
Area 1200 m² / 12920 ft²
Tools used Autodesk Revit, Strucsoft MWF Advanced Metal, SCIA Engineer, Tekla Tedds
Share:
Code/Authority List:
  • 2022 California Residential Code (CRC);
  • 2022 California Building Code (CBC);
  • ASCE 7-16 minimum design loads and associated criteria for buildings and other structures.
Production
Drawings

Click on preview to view high resolution PDF drawings

Benefits
A highly precise bill of materials based on the BIM model
The ability to utilize the BIM model of LGS framing for clash detection with other trades
Tools used
1
Autodesk Revit
1
Strucsoft MWF Advanced Metal
1
SCIA Engineer
1
Tekla Tedds
view project view more view photos